| Quote Number | QUO-2536 |
| Quote Date | 26/08/2025 |
| Valid Until | 10/09/2025 |
| Total | £23,599.00 |
126 New Kings Rd, London SW6 4LZ
This price quotation number 2536 is confidential and shall not be used for legal purposes or disclosed to any third parties without prior written authorization. Any unauthorized use or disclosure will result in charges being applied to cover associated damages and administrative costs.
The following drawings have been taken into account in the preparation of this quotation.
MD Architecture_Chalfort Penthouse_Lighting MD Architecture_Chalfort Penthouse_Electrical
| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 47 | 13A 2-Gang SP Switched Socket -Double/Single /Shaver . Installation of standard 13A switched socket outlet including wiring, mounting, and testing in accordance with BS 7671 regulations. |
£120.00 | 0% | £5,640.00 |
| 2 | Tv/Sat tv aerial and satellite wall socket installation |
£125.00 | 0% | £250.00 |
| 7 | Smoke /Heat Detector Installation, wiring, and testing of detector in accordance with BS 5839 standards. |
£145.00 | 0% | £1,015.00 |
| 77 | Lighting Installation – As Per Drawings Installation of various internal and external lighting fixtures including pendant lights, IP-rated fittings, and external wall lights, as per supplied drawings/layout plans. |
£95.00 | 0% | £7,315.00 |
| 1 | HVAC Electrical Main Supply – Installation & Testing Installation of dedicated electrical main supply for HVAC system, including supply and routing of appropriate cable (e.g. 6mm² or 10mm² twin & earth / SWA), installation of isolator switches, and connection to consumer unit/distribution board. Cable containment (tray, trunking, conduit) where required All work completed in accordance with BS 7671 (IET Wiring Regulations) and coordinated with HVAC/mechanical team as required. HVAC equipment supplied and installed by others. Note: Ventilation system and final equipment connections to be completed by others. Our scope is limited to electrical supply only. |
£1,450.00 | 0% | £1,450.00 |
| 1 | Materials – Socket backbox and Cables (Ring Circuit per Room) Supply of electrical materials including back boxes, and 2.5mm² twin & earth cable for wiring each room on a dedicated ring circuit. Due to the design specification requiring one ring circuit per room, additional cable lengths are required to ensure compliance with BS 7671 (18th Edition) and to provide future-proofed circuit segregation. All materials selected to meet UK electrical standards and installation to be carried out in accordance with the IET Wiring Regulations. |
£1,240.00 | 0% | £1,240.00 |
| 1 | First Fix Materials – Lighting Circuits (Cables & Back Boxes Only) Supply of first fix materials for lighting circuits, including 1.0mm² and/or 1.5mm² twin & earth cable and suitable back boxes for light switches and ceiling points. Installation designed with individual lighting circuits per area/room, as per electrical layout drawings. Additional cable lengths may be required to accommodate circuit separation, switching configurations (e.g. 2-way), and accessory positions. Materials compliant with BS 7671 and IET Wiring Regulations (18th Edition). |
£850.00 | 0% | £850.00 |
| 1 | First Fix Materials – Smoke Detector Circuit (Cables & Back Boxes Only) Supply of first fix materials for the smoke/heat detector circuit, including 1.0mm² or 1.5mm² fire-rated cable (e.g. FP200 Gold or equivalent) and suitable back boxes for base mounting. Circuit to be installed in accordance with BS 5839-1 (commercial) or BS 5839-6 (residential), with wiring routes and detector locations as indicated on the provided fire alarm layout drawings. Smoke Detector Certificate BS 5839-6 Domestic Fire Alarm Installation Certificate This certificate confirms that the smoke/heat detectors have been installed and tested in compliance with: BS 5839-6 (Code of practice for the design, installation, commissioning and maintenance of fire detection and fire alarm systems in domestic premises) |
£780.00 | 0% | £780.00 |
| 1 | First Fix Materials – Cooker Circuit (Cables & Back Boxes Only) Supply of first fix materials for dedicated cooker circuit, including 6mm² twin & earth cable and appropriate cooker connection back box. Circuit installation designed in accordance with BS 7671 (IET Wiring Regulations) to accommodate the cooker load safely and separately from other circuits. Materials compliant with BS 7671 and suitable for high-current cooker circuits. |
£675.00 | 0% | £675.00 |
| 1 | Consumer Unit Installation, Testing & Commissioning (Client-Supplied) Installation of client-supplied consumer unit (distribution board) including all associated wiring, mounting, and connections as per project specifications. Full electrical testing and commissioning carried out in accordance with BS 7671 (IET Wiring Regulations), including insulation resistance, continuity, polarity, earth fault loop impedance, and RCD testing. Certification and test reports provided upon completion. Consumer unit supplied by client |
£1,750.00 | 0% | £1,750.00 |
| 1 | TV Aerial / Satellite System – First Fix Materials & Installation Supply and installation of TV aerial and/or satellite cables/backboxes including first fix materials such as coaxial cable (RG6 or WF100), cable clips, junction boxes, satellite F-connectors, and wall plates. |
£650.00 | 0% | £650.00 |
| 1 | HVAC Electrical First Fix Materials Supply of first fix electrical materials for HVAC system installation. Includes: Power main cabling (e.g. SWA, T\&E) sized according to load requirements (not controlling cables) Note: Final HVAC equipment, isolators, and second fix components (e.g. terminations, commissioning) are excluded and to be provided or installed by others. |
£1,100.00 | 0% | £1,100.00 |
| 1 | Other Expenses and Sundry Costs" Miscellaneous expenses incurred during the course of the project, including but not limited to: Site parking fees These costs support the smooth and timely execution of the works and are necessary for compliance with site access and safety requirements. |
£884.00 | 0.00% | £884.00 |
| Sub Total | £23,599.00 |
| Tax | £0.00 |
| Total | £23,599.00 |